This year we’ll be digging throughout July. The plan is to reopen the 2009 trenches to further explore some of the architectural features. We’ll be fully excavating the ‘furnace’ structure in Trench B and trying to tie it in with the stone wall footings near the edges of the trench, as well as further exposing the domestic structure in Trench D. The large wall in Trenches G and G2 will also be further investigated.
Advertisement